Skip to content

Daily Exchange Rates

This scenario loads exchange rates from a spreadsheet into Sage Intacct each day. It adds a rate for each new date, and corrects the rate for a date Intacct already has. A bank or a rates service usually supplies the file.

An IMan integration diagram of four transforms in a row: an Excel reader, a Hierarchise transform, a Map and an Intacct writer

Set Up the Exchange Rates in Intacct

The Exchange Rate import updates an exchange rate and cannot create one. Set up each exchange rate in Intacct first: its rate type, its from currency and its to currency. See Exchange Rate.

Read the Rates

An Excel reader reads one row per rate:

ID TypeName FromCurrency ToCurrency StartDate FXRate
1 Intacct Daily Rate EUR USD 10/29/2026 1.0812
1 Intacct Daily Rate EUR USD 10/30/2026 1.0797
2 Intacct Daily Rate GBP USD 10/29/2026 1.2954
2 Intacct Daily Rate GBP USD 10/30/2026 1.2971

Group the Rates by Exchange Rate

The Exchange Rate import takes one record for each exchange rate, with its dated rates beneath it. A Hierarchise transform groups the rows into one Record for each exchange rate, with each row's StartDate and FXRate in a child Rates transaction. A Map follows it, before the writer.

Write the Rates

The Field Mapping tab of the Intacct writer. Under Transaction Level Mapping, Record maps to EXCHANGERATE and Rates to EXCHANGERATEENTRY. The grid maps TypeName to Exchange rate type (TYPENAME), FromCurrency to From currency (FROM_CURRENCY) and ToCurrency to To currency (TO_CURRENCY), and leaves SYS.INPUTFILE unmapped

An Intacct writer on EXCHANGERATE maps:

  • Record to EXCHANGERATE: TypeName to TYPENAME, FromCurrency to FROM_CURRENCY and ToCurrency to TO_CURRENCY. IMan finds the exchange rate in Intacct by its type and from currency;
  • Rates to EXCHANGERATEENTRY: StartDate to EFFECTIVE_START_DATE and FXRate to EXCHANGE_RATE.

In a company with more than one base currency, two exchange rates can share a type and a from currency. Map the exchange rate's RECORDNO there to name the one you mean.

Running It

Schedule the integration once a day, after the file arrives. A second run over the same file is safe: IMan sets the same rate on the same date again. Rates on dates the file leaves out stay as they are.